Development Cost Ledger and Pay Applications
Development teams now run a project's construction money in one line of record: bids leveled and awarded, scopes broken into a schedule of values, contractor pay applications approved against that schedule, and draws built only from work that cleared approval.
- Awards happen off a leveling matrix that shows unpriced lines, open clarifications, and anything else blocking a decision, and awarding around a blocker records the reason.
- Pay applications move through an approval gate, print on the standard contractor forms, and roll up into a lender draw package as a document or a spreadsheet.
- Every cost line is classified as district eligible, developer share, or non-district as it is entered, so the reimbursable figure comes off the ledger instead of a side spreadsheet.
- Budget lines carry estimate to complete, estimate at completion, and variance at completion, and change orders adjust the schedule of values they sit on.
Lot Allocation Rules and Readiness Certificates
Land bankers can set the rule that decides which lots a builder takes next, and issue a dated exhibit carrying full legal descriptions for every takedown, instead of assembling that roster by hand each time.
- Allocation rules cover ready first, sequential, round robin across blocks, and assigned blocks, with section, premium, and hold back filters applied to the live roster.
- Each exhibit lists lot, block, section legal name, plat number, recording date, and recordation number, and prints with a signature block.
- An issued takedown exhibit becomes the closing instructions for that takedown, and a plat that records drafts a recordation exhibit across the whole roster.
- Lots now carry readiness certificates with supporting evidence, and on facilities that require it a takedown cannot be funded until the lot is certified ready.
Entitlement Path and District Reimbursement
Entitlements now run as a dated path on the project schedule with the obligations a development agreement creates hanging off it, and each district has its own view of what it can be reimbursed for and when it can apply.
- Entitlement milestones sit on the project schedule board beside construction phases, each carrying its own notes, with a master planned community template to start from.
- A task that lands in the wrong construction season is flagged, and a project cannot advance a stage while an entitlement it depends on is still open.
- Obligations from a development agreement seed budget lines as the project advances, so a commitment made at the negotiating table shows up in the budget.
- Each district carries a reimbursable cost register measured against its bond threshold, a developer interest clock with its cap, engineer completion certificates per contract, and a bond packet that exports as a document and a spreadsheet.
Go-Hard Decision Packet
Acquisition teams can run a feasibility period inside Pipsy and produce the packet an investment committee signs, with the findings, the yield, and the clock all on one page.
- Due diligence findings are typed by kind and carry what each one does to the deal.
- Yield versions are tied to land plan revisions, and the version a team settles on can be pushed into underwriting.
- A feasibility clock and a soft cost burn tile show how much time and money is left before the deposit goes hard.
- Go, no go, and extend decisions are recorded against the project, and a project cannot leave due diligence with its packet undecided.
Field Log
Superintendents can work the punch list from a phone on the lot in front of them, with photographs and location captured on the spot, and log the day's crews and equipment before leaving the site.
- Punch items carry the lot they belong to, photographs, location, who raised them, and who signed them off.
- The daily log records the phase, the lots worked, manpower, and equipment on site.
- Open punch items feed the lot's readiness, so a lot with work outstanding cannot quietly be certified.
- Drive Mode notes go to several recipient groups at once, including superintendents, and a pad ready flag can be set from the truck.
Pro Forma 2.0 and the Living Model
Pro formas are edited directly in a grid and approved as a snapshot, and the model keeps reading itself against reality: what was underwritten, what is under contract with builders, and what has actually closed.
- A template library starts a new deal from a standard structure, and approving a pro forma snapshots it so later edits cannot rewrite the approved deal.
- Lot products carry a tax card covering school district, county, municipal district, improvement district, and HOA, so the burden a buyer will see is modeled with the deal.
- A builder commitment log follows a deal from letter of intent through executed contract, with cadence and incentives, and shows takedown risk per lot product.
- Gap out snapshots show pace against underwriting with the date the next phase has to deliver by, and a phase can be opened, released, or held straight from the row.
Plat Intake and County Records
Development teams can bring a plat in from the engineer's drawing and assign it straight to a phase, fix anything that lands wrong on the map, and read each lot's county appraised value in Pipsy.
- Blocks or lot number ranges are assigned to a phase, with the boundary, lot geometry, and counts coming across with them, and an import can be reverted.
- Lots that land in the wrong place are corrected on the map rather than imported again, and every change to a lot is kept in an audit trail.
- The surface to grid factor is remembered per community, and a duplicate outline is flagged before anything is created.
- County appraisal records sync across county lines, so a community that straddles a county boundary reads as one, and each lot carries its appraised value.